Building Information Certificate

Building Information Certificate Required Information

The following information is required:

Document

Notes

Plans

Full drawings of the building (1:100 scale/1:200)

  • Site plan
  • Registered Survey Report
  • Floor plan depicting unauthorised work
  • Elevations and sections
  • A4 size notification plans
  • Works as executed stormwater/drainage plans
  • Sydney Water stamped plans
  • Shadow diagram/profiles

Installation certificates relating to essential fire safety measures

Details of proposed and existing fire safety measures as required by the Building Code of Australia (BCA), including certification.

BCA Report

  • Report outlining compliance with current BCA

Installation certificates relating to structural elements, stormwater, health and amenity (please note, other certification may be requested)

  • Structural engineers report
  • Pest management AS3660
  • Wet Area waterproofing
  • Electrical certification of integral energy
  • Glazing certification for safety glass
  • Smoke detector certification
  • Other certification may be requested

Statement of Environmental Effects

Full description of the proposal and assessment against relevant LEP and DCP requirements, including a compliance report/table

Energy and sustainability performance certificate

To be sourced from www.basix.nsw.gov.au

Annual Fire Safety Statement

Class 2-9 buildings only

Building Information Certificate Application